• Opened

    28 May 2009
    (in Phases)

    Length

    35.7 km
    (with 30 stations)

    Operated By

    smrt

    Building the Circle Line (CCL) was a feat that required innovations in design, engineering and construction. It took place in challenging soil conditions, a maze of underground structures, and under a densely packed surface of roads, expressways and buildings.

    Proposals for the line began in the 1990s, and plans for the CCL evolved to:
    - cater to growing public transport demand,
    - distribute commuter traffic away from busy interchanges, and
    - create a greater number of connections and faster journeys.

    As its name suggests, the 30-station CCL is a circular rail line linking the North-South, East-West and North East Lines to the city.

    (Source: LTA

    Line Diagram