Overview

The fully driverless Punggol and Punggol Light Rapid Transit (SPLRT) system serves two of the fastest-growing residential estates in Singapore.

The Punggol LRT was opened in 2005. It links commuters from the residential areas to Punggol MRT station on the North East Line and the Punggol bus interchange. The trains run along two loops and currently serve 14 stations.

Both LRT systems were upgraded from one-car to two-car operations in 2016. In the coming years, more of such two-car trains will be added to the SPLRT fleet to better serve the long term public transport needs of the communities in Punggol and Punggol. To accomodate more two-car trains, the SPLRT depot will be expanded by 2027.

(Source: LTA)

Opened

29 January 2005
(In Phases)

Length of Line

10.7 km
(with 15 stations)

Operator

sbst